Building Permits in ZIP 94134
San Francisco, CA — 139 permits filed recently
139 permits
re-roofing (no hotworks)
voluntary structural strenthening. install foundation bolting at perimeter & structural walls at first floor (e) sill/(e) fndt locations. not visible from street, located in garage. (brace & bolt prog...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
to obtain final inspection for work approved under pa 201104214530. all work is complete.
remove existing finish surface and stucco soffit. remove existing balcony sheating and membrane. replace structural joist as detected by engineer. install proposed balcony sheeting. install cement mod...
solar permit: installing 14 solar pv modules, 410 watts per module, total no. of rating 5.74 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 13.5 vac, with 13.5 kwh each in capaci...
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).
reroofing, tear off existing roof covering, modified bitumen shall be installed, hot works.
remodel of bathroom, remodel, in kind kitchen, new heat pump. new pocket door between kitchen and laundry. work in rear building.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
legalize ground floor unit as adu and to abate nov# 202545522, construct non-load bearing paritition and new fire rated partition, modification to ceilings, ground, lighting, mechanical, plumbing, win...
deferred submittal block 7 - prefabricated metal stairs pa# 202211297323-s3.
replace (e) sunroom with a new aluminum sunroom attached to the (e) house wall. with 3 lights, 3 outlets and 1 switch wired to (e) gfci outlet.
re-roofing. hot works.
kitchen renovation in kind, bathroom renovation in kind, tub to shower, all new fixtures. replace electrical panel. no layout change, no wall stud framing demolition
perform work to comply with nov #202651348 item #2: dryer exhaust, and nov# 202651331 work without permit to legalize kitchen and bathroom remodels. no changes to floor plan.
reroof, no hot work.
add a new residential unit on 3rd floor, including 3 bedrooms & 3 bathrooms.
back of bldg: remove trim around windows, remove wood siding and install new cedar wood siding, install structual sheathing on back side approx 25x25 with 1/2" ply w/ 6" nailing 12d throughout edge an...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)