Sprinkler modifications taking place on the 31st floor (32nd Marketing floor) as indicated on the drawings.
Modifications to plumbing / sprinkler system for interior demo, install TCSP on 26 & 27th floor
Demolition of plumbing and sprinkler fixtures and piping on 46th floor with associated TCSP to protect building core
Modification to Plumbing, Sprinkler and Standpipe Systems as per plans filed herewith.
(9th floor - general catalyst) filing here with drawings indicating the installation of sprinkler temp loop and sprinkler renovations to an existing sprinkler system. there will be…
Filing herewith for modifications to existing sprinkler systems
Installation of a siamese extension to sidewalk barricade as per the filed drawings. No change to use, occupancy or egress.
Sprinkler modifications taking place on the 3rd floor as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing and Sprinkler modifications as per plans filed herewith. No change in egress, use or occupancy.
demolition of plumbing and sprinkler fixtures & piping and installation of TCSP loop for building core on 41st floor
Modification to plumbing and sprinkler systems as per plans filed herewith.
Modifications to the existing Sprinkler System: Relocate (12) existing sprinkler heads and piping and install (1) new head and associated piping on the 8th Floor as per plans (Kirb…
Plumbing and sprinkler work associated with bathroom renovation. no change in use egress or occupancy.
Herewith filing for modification of existing sprinkler system as per the drawings. No change in use, egress or occupancy.
Modifications to the existing sprinkler system: Install (7) new heads, relocate (15) heads and remove (3) existing heads on the 28th Floor (CO)/ 29th Floor (Mktg) as per plans (ELH…
Modifications to the existing Sprinkler System: Installation of (9) new sprinkler heads and associated piping and relocate (10) existing heads and piping on the 28th Floor (CO)/ 29…
Removal of sprinkler heads and related piping and temporary core sprinkler protection as shown on drawings filed herewith. No change in use, egress or occupancy.
Sprinkler modifications taking place on the 17th floor (21st floor Marketing) as indicated on the drawings.