Sprinkler modifications taking place on the 21st floor as indicated on the drawings.
Install (192) new sprinkler heads and (26) temp heads on 17th Floor and (379) new heads, (45) temp heads and remove (1) FHR and install (1) FHC on 18th Floor and associated Sprinkl…
Sprinkler modifications taking place on the 20th floor as indicated on the drawings.
Demolition of sprinklerloops, sprinkler heads, all associated piping, etc. inan existing retail space's cellar and first floor. allnew or remaining work is as specified on plans he…
Remove & replace fixtures in core restrooms. Furnish and install new plumbing fixtures and related piping in pantry & wellness room. Furnish and install sprinkler main, branch pipi…
Modifications to the existing sprinkler system on the 34th floor as per plans. No change to use, egress or occupancy.
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modifications to the existing sprinkler system on the 23rd Floor- (Orrick Buildout) as per plans. No change to use, egress or occupancy.
Modifications to the existing Sprinkler System: Install (3) new sprinkler heads and relocate (6) existing sprinkler heads and associated piping each on the 25, 26 and 28th Floors a…
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Sprinkler modifications as per plans filed herewith. no change to use, bulk, egress, or occupancy is proposed.
Sprinkler modifications taking place on 41st floor construction (61st floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Filing herewith modification to an existing sprinkler system as per plans on 17th floor. No change to use, egress or occupancy.
Removal of sprinkler work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)