Removal of sprinkler work as per plans. No change in use, egress or occupancy (Box Office/Flatbush Entry/Lobby)
Filing herewith modification to an existing sprinkler system as per plans on 17th floor. No change to use, egress or occupancy.
Sprinkler modifications as per plans filed herewith. no change to use, bulk, egress, or occupancy is proposed.
Sprinkler modifications taking place on 41st floor construction (61st floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Sprinkler work as per plans. No change in use, egress or occupancy (Baseline Club)
Sprinkler modifications taking place on floors 001-002 as per plans filed herewith. No change in Use, Egress or Occupancy.
Hereby to remove fire hose cabinet as shown on plans filed herewith. No change to use, occupancy or egress.
Additions and modifications to existing plumbing/sprinkler fixtures as per plans filed herewith. No change to use, egress, or occupancy.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of 2 drinking fountains & 112 new sprinkler heads. No change in use, egress or occupancy.
alterations to existing SP Systems as per plans filed herewith
Removal of sprinkler heads and installation of temporary sprinkler loop on the 15th and 16th floor as indicated on drawings.
Seyfarth Shaw-- Modifications to existing sprinkler system on parts of the 31st, 32nd, and 33rd floors.