alterations to existing SP Systems as per plans filed herewith
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Seyfarth Shaw-- Modifications to existing sprinkler system on parts of the 31st, 32nd, and 33rd floors.
Removal of sprinkler heads and installation of temporary sprinkler loop on the 15th and 16th floor as indicated on drawings.
Relocate existing sprinkler heads for ceiling modifications on 2nd floor.
Filing herewith for Standpipe modification as per plans.
Filing to add/modify the plumbing and sprinkler fixtures for Bank of America.
Modifications to sprinkler and plumbing systems as per plans filed herewith. No change of use, occupancy or egress.
Modification to existing Plumbing fixtures and sprinklers as per plans filed herewith. No change in use, egress or occupancy.
Modifications to existing sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress, or occupancy.
Filing herewith for Sprinkler piping work as per plans. No change to use, egress or occupancy.
Installation of sprinkler heads under a temporary construction scaffolding as per the filed plans. No change to use, occupancy or egress.