Sprinkler work as shown on plans filed herewith.
Modification of existing sp system
Mount sinai - pediatric school and hospital faculty support - sprinkler modifications as per plans filed herewith.
Sprinkler modifications on the 20th floor as per plans filed herewith. no change in use, egress, or occupancy.
Modifications to the existing sprinkler system on the 28th floor (WB) as per plans. No change to use, egress or occupancy.
Herewith Filing Modification to existing Sprinkler system as per plans and in conjunction with Interior Renovations.
Modification to the existing sprinkler system on the 17th floor ( Heyman Buildout) as per plans. No change to use, egress or occupancy.
Herewith filing to modify the plumbing and sprinkler fixtures. No change to use, egress, or occupancy.
Modification to existing Sprinkler and plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modifications to existing sprinkler system for Suite 2270
New plumbing system for kitchen and offices, demo all existing fixtures in mission house. modifications and additions to existing sprinkler system.
Removal and installation of new sprinkler heads as per plans filed herewith. no change to use, egress or occupancy
Sprinkler modifications as per plans filed herewith. No change in use, egress, or occupancy.
Sprinkler modifications as per plans filed herewith. no change in use, egress or occupancy
Filing herewith removal of an sprinkler pre-action system and modification to the existing sprinkler and standpipe system as per plans filed herewith.(39th to 42nd Construction FL.…
Removal of existing sprinkler system with installation of a temporary loop on the 39th floor (LL Demo) as per plans. No change to use, egress or occupancy.
interior demolition of cellar through 5th floors. No structural demolition.
Furnish & install new sprinkler booster pump, associated FCVA, sprinkler/standpipe risers and piping (Harry Winston Infrastructure) as per plans. No change to use, egress or occupa…