Permits (46)
Modifications to the existing Sprinkler System: Remove (1) sprinkler head and Install (2) new heads and associated Sprinkler Piping on the 10th Floor as per plans (Hines - ADA Restroom.) No change to...
Sprinkler work for elevator lobby renovation
Sprinkler work on associated piping as shown on plans filed herewith at construction floor 8/marketing floor 10. including install and removal of temporary core sprinkler protection.
Sprinkler work on associated piping as shown on plans filed herewith at construction floor 8/marketing floor 10. including install and removal of temporary core sprinkler protection.
Sprinkler work as shown on plans filed herewith.
Sprinkler work as shown on plans filed herewith.
Modifications to the existing sprinkler system on the cellar floor (Harry Winston - Cellar Fit-out) as per plans. No change to use, egress or occupancy
Modifications to the existing sprinkler system on the cellar floor (Harry Winston - Cellar Fit-out) as per plans. No change to use, egress or occupancy
Modification to existing sprinkler system and related piping as shown on drawings. no change to use, egress or occupanyc.
Modification to existing sprinkler system and related piping as shown on drawings. no change to use, egress or occupanyc.
Plumbing and Sprinkler scope associated with the renovation of the one-tenant office space on 34M/33C floor. No change of use, egress, or occupancy.
Sprinkler modifications taking place on the 9th floor as indicated on the drawings.
Sprinkler work to include demolition and installation of temporary loop and plumbing work to include demolition of existing fixtures.
Sprinkler modifications taking place on the 9th floor as indicated on the drawings.
Relocation of Fire Department valve cabinet.
Relocation of Fire Department valve cabinet.
Sprinkler work as shown on plans filed herewith. No change to egress, use or occupancy.
Sprinkler work as shown on plans filed herewith. No change to egress, use or occupancy.
Install (324) new sprinkler heads and associated sprinkler piping on the 21st Floor as per plans (RGHQ Relocation.) No change to use, egress or occupancy.
Removal, relocation and new installation of sp heads as per plans