Modifications to the existing plumbing system on the 8th (Restrooms) and 9th (Whitebox) floors as per plans. No change to use, egress, or occupancy.
sprinkler standpipe modifications associated with alt-co M01328972 for conversion of existing commercial 12-storey commercial building to mixed-use commercial and residential use o…
Modifications to the existing sprinkler system on the 18th and 21st floors as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 18th and 21st floors as per plans. No change to use, egress or occupancy.
Remove 24 sprinkler heads. install 3 temporary loop heads and piping. install 31 permanent sprinkler heads and piping.
Modification to existing core and shell space sprinkler and plumbing fixtures for tenant improvements. No change to use, egress, or occupancy.
Sprinkler head removal and installation of temp loop. no change in use, occupancy, or egress.
Application filed for sprinkler additions/modifications on the 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Herewith filing for the installation of a temporary standpipe and pressurization alarm system on floors cellar, 1-12 (including mezzanine) and roof. no change to use, egress or occ…
Sprinkler modifications taking place on the 22 floor as per plans filed herewith. No change in use, egress or occupancy
plumbing modifications taking place on the 22 floor as per plans filed herewith. No change in use, egress or occupancy
Plumbing work for proposed alteration as per plans filed.
It is proposed to modify the existing sprinkler system and install a new standpipe system as shown on plans for the existing school. no change to use, egress or occupancy.
It is proposed to remove and install plumbing fixtures in an existing school as shown on plans. no change to use, egress or occupancy.
Plumbing work on the 10th floor (Dubin & Co.) as indicated on drawings.
Sprinkler/standpipe work as per plans filed.
Modification to the existing plumbing system on the 45th floor as per plans. No change to use, egress or occupancy.
Modification to the sprinkler system on the 45th floor as per plans. No change to use, egress or occupancy.
Remove and cap the water, sanitary, and gas pipes that run from the cellar to the 3rd floor.