Modifications to the existing sprinkler system on the 6th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 6th floor as per plans. No change to use, egress or occupancy.
Modification of existing sprinklers and addition of a second sprinkler control valve.
Sprinkler work on the 10th floor (Dubin & Co.) as indicated on drawings.
Temporary Dry Standpipe System as shown per plan. No change in use, egress of occupancy
The demolition & construction of the gas meter rig is on the 1st floor (construction). A new 6 gas riser is to be constructed to serve the 30th construction floor (31st tenant floo…
Sprinkler work on the 10th floor (LB Pharama) as indicated on drawings.
Remove 19 sprinkler heads & install 309 new sprinkler heads and piping.
Modification, relocation, or addition of sprinkler heads and related piping to provide necessary coverage.