Temporary Dry Standpipe System as shown per plan. No change in use, egress of occupancy
The demolition & construction of the gas meter rig is on the 1st floor (construction). A new 6 gas riser is to be constructed to serve the 30th construction floor (31st tenant floo…
Remove 19 sprinkler heads & install 309 new sprinkler heads and piping.
Sprinkler work on the 10th floor (LB Pharama) as indicated on drawings.
Modification, relocation, or addition of sprinkler heads and related piping to provide necessary coverage.
Sprinkler head changes as indicated on plans.