Armon Mechanical Inc
Permits (48)
Modification of existing sprinklers and addition of a second sprinkler control valve.
Modifications to the existing sprinkler system on the 6th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 6th floor as per plans. No change to use, egress or occupancy.
Modification of existing sprinklers and addition of a second sprinkler control valve.
Modifications to the existing plumbing system on the 6th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 6th floor as per plans. No change to use, egress or occupancy.
Sprinkler work on the 10th floor (Dubin & Co.) as indicated on drawings.
Sprinkler work on the 10th floor (Dubin & Co.) as indicated on drawings.
Temporary Dry Standpipe System as shown per plan. No change in use, egress of occupancy
Temporary Dry Standpipe System as shown per plan. No change in use, egress of occupancy
The demolition & construction of the gas meter rig is on the 1st floor (construction). A new 6 gas riser is to be constructed to serve the 30th construction floor (31st tenant floor), the existing 4 g...
The demolition & construction of the gas meter rig is on the 1st floor (construction). A new 6 gas riser is to be constructed to serve the 30th construction floor (31st tenant floor), the existing 4 g...
Sprinkler work on the 10th floor (LB Pharama) as indicated on drawings.
Remove 19 sprinkler heads & install 309 new sprinkler heads and piping.
Sprinkler work on the 10th floor (LB Pharama) as indicated on drawings.
Remove 19 sprinkler heads & install 309 new sprinkler heads and piping.
Modification, relocation, or addition of sprinkler heads and related piping to provide necessary coverage.
Modification, relocation, or addition of sprinkler heads and related piping to provide necessary coverage.
Sprinkler head changes as indicated on plans.
Sprinkler head changes as indicated on plans.