Consigli Construction Co
Permits (121)
support of excavation
HIP Sprinkler: Partition and ceiling modifications to accommodate the sprinkler upgrades as per plans. No change to use, egress or occupancy.
support of excavation
HIP Sprinkler: Modification of HVAC equipment and ductwork to accommodate sprinkler upgrades as per plans. No change to use, egress or occupancy.
Earthwork associated with the nb job #b00956486-i1
Northwell Health LIJ Medical Center: Separation of Branches ECCC Phase: rearrange interior non-bearing partitions, install wall and floor finishes and hung ceiling as per plans filed herewith. No chan...
Northwell Health LIJ Medical Center: Separation of Branches ECCC Phase: rearrange interior non-bearing partitions, install wall and floor finishes and hung ceiling as per plans filed herewith. No chan...
Sherred hall - modifying the existing wood roof trusses tosupport proposed mechanical equipment. additional work includes wood framing, steelframing and lintels, and slab on metal deck
Sherred hall - modifying the existing wood roof trusses tosupport proposed mechanical equipment. additional work includes wood framing, steelframing and lintels, and slab on metal deck
Construction of interior partitions, doors and ceilings as shown on drawings. Removal of select non-structural demising walls. No change in use, egress or occupancy.
Mechanical equipment use in conjunction with the full removal of the sky bridge.
Foundation work scope filed for construction of approximately 41 square feet of concrete foundation underpinning of the existing building to facilitate the structural renovations of the existing build...
Support of excavation work scope filed for construction of new elevator and approximately 41 square feet of concrete foundation underpinning of the existing building on site
Mechanical equipment use in conjunction with the full removal of the sky bridge.
Foundation work scope filed for construction of approximately 41 square feet of concrete foundation underpinning of the existing building to facilitate the structural renovations of the existing build...
Support of excavation work scope filed for construction of new elevator and approximately 41 square feet of concrete foundation underpinning of the existing building on site
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Construction of interior partitions, doors and ceilings as shown on drawings. Removal of select non-structural demising walls. No change in use, egress or occupancy.
Temporary stabilization, including shoring, jacking, and bracing, to allow for existing column repairs as per plans.
Temporary stabilization, including shoring, jacking, and bracing, to allow for existing column repairs as per plans.