Removal of exterior work no changes to egress, occupancy or use.
Facade repairs including repointing, brick, lintel and sill replacement from 4th-floor windows to grade. Includes 1st-floor low roof replacement, memorial wall repairs, courtyard f…
Mechanical work on the 3rd, 22nd floors and Roof. No change in occupancy, use or egress.
Structural work in conjunction with Facade repairs including repointing, brick, lintel, and sill replacement from 4th-floor windows to grade. Includes 1st-floor low roof replacemen…
Interior renovations on the 3rd floor. No change in occupancy, or egress.
Removal and replacement of (Roof) play roof slab, including parapets and select facade areas, with minor 4th floor work to support structural roof deck replacement. no change to us…
Dodge hall - scope includes reconfiguration of storage, removing closets in dormitory rooms, and patching the floor at wall removal. no change to use, egress, or occupancy.
Extension of Existing Stair to Roof Level in the existing hospital building.
Nypq or upgrades - general construction including modifications to existing ceilings, floors, partitions and doors as per plans filed herewith. no change in use, egress or occupanc…
Pintard hall -the scope of work includes exhausting the kitchen and bathroom in the new lounge space. this work will include:- exhaust fans- ductwork- ductwork insulation- air inle…
Foundation and earthwork being filed in conjunction with new building.
Seabury hall - removal and installation of mechanical ductwork and equipment.
Sherred hall - installation of a self-contained storm water system with detention tank in the open space of the interior courtyard. there is no connection to the city water supply…
Conversion from office (b) occupancy to residential (r-2) occupancy pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law fo…
Structural work in conjuction with the nb #b00956486-i1
Northwell LIJ Kaufman: existing courtyard renovations in OSP on private hospital property, including concrete ramp & paving renovations, removal of existing mesh fencing & replace…
The proposed new building for the marlboro agricultural education center located on the nycha campus.
Construction of a house of workship on subcellar, cellar, and ground floor within a core andshell area of an existing building, together with associated offices and other support s…