L-4 cardiology phase 3: hvac modifications to accommodate the phase 3, cardiology, in the existing hospital building as per plans filed herewith. no change to zoning, use, egress o…
Provide support of excavation work as per plans filed. subsequent filing to nb #m00625489.
F bldg sp ph3: modification of interior finishes and ceilings to accommodate the sprinkler upgrades within the existing hospital building as per plans. no change to use, egress or…
Chapel & sacristy- removal and installation of interior partitions to reconfigure existing bathroom. no change in use, egress or occupancy. see comments.
HIP Sprinkler: Modification of HVAC equipment and ductwork to accommodate sprinkler upgrades as per plans. No change to use, egress or occupancy.
support of excavation
HIP Sprinkler: Partition and ceiling modifications to accommodate the sprinkler upgrades as per plans. No change to use, egress or occupancy.
Earthwork associated with the nb job #b00956486-i1
Northwell Health LIJ Medical Center: Separation of Branches ECCC Phase: rearrange interior non-bearing partitions, install wall and floor finishes and hung ceiling as per plans fil…
Sherred hall - modifying the existing wood roof trusses tosupport proposed mechanical equipment. additional work includes wood framing, steelframing and lintels, and slab on metal…
Construction of interior partitions, doors and ceilings as shown on drawings. Removal of select non-structural demising walls. No change in use, egress or occupancy.
Support of excavation work scope filed for construction of new elevator and approximately 41 square feet of concrete foundation underpinning of the existing building on site
Foundation work scope filed for construction of approximately 41 square feet of concrete foundation underpinning of the existing building to facilitate the structural renovations o…