General construction modifications for ceiling repair/replacement throughout the hospital related to sprinkler upgrade. no change in use, egress or occupancy.
Filing herewith installation of pre-construction test piles and test pits with site restoration as per plans. no change in use, egress or occupancy under this application. filed un…
Nypq -mechanical modifications as per plans filed herewith. no change in use, egress or occupancy.
Filing herewith civil work and site restoration associated with plumbing and utilities work as per plans. filed in conjunction with nb# q01267398 under mpp project-000000254.
Filing herewith civil work and site restoration associated with utilities relocation and detention tank and stormwater system enabling work as per plans. filed under mpp project-00…
We modify the 1st Floor steel framing and roof dunnages.
Filing herewith temporary construction fence as per plans. no change in use, egress or occupancy under this application. filed in conjunction with mpp-254.
Installation of temporary construction fence for use during new construction.
IR3 - renovation to part of the hospital building on 3rd floor including new partitions and finishes as per plans.
PH SP: Modification of HVAC equipment and ductwork to accommodate alterations within the existing hospital building as per plans.
Gp7 ped surgery: hvac modification to accommodate the pediatric icu renoavtion, greenberg pavilion, in the existing hospital building. no change to zoning, use, egress or occupancy…
Annex Garage: Structural and general const. work to accommodate slab repairs to the existing garage as per plans. no change to use, egress or occupancy.
Gp6 picu: hvac modifications to accommodate the pediatric icu renoavtion, greenberg pavilion, in the existing hospital building. no change to zoning, use, egress or occupancy.
Gp7 ped surgery: modification to interior partitions and finishes to accommodate the pediatric icu renoavtion, greenberg pavilion, in the existing hospital building. no change to z…
Installation of temporary bracing as per plans filed herewith. This application is filed in conjunction with NB B08029013-I1.
Project scope is to include interior fit-out of fifth and sixth floors of an existing building. New interior construction to include laboratory spaces, open work spaces and enclose…
Renovation of the cellar level fitness, public restrooms, first floor lobby renovation and reception areas. no change in use, egress or occupancy.
Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change to use, egress, or occupancy.
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.