Hunter Roberts Constructi
Permits (73)
Structural work as per plans filed
Imc 9 fl: - modifications of interior partitions and finsihes at partial 9th floor within the existing hospital buildings as indicated on plans filed herewith. no change to use, egress or occupancy.
Imc 9fl: modification of hvac equipment and ductwork to accommodate alteration to the behavioral healt unit as per plans. no change to use, egress or occupancy
Imc 9fl: modification of hvac equipment and ductwork to accommodate alteration to the behavioral healt unit as per plans. no change to use, egress or occupancy
Imc 9 fl: - modifications of interior partitions and finsihes at partial 9th floor within the existing hospital buildings as indicated on plans filed herewith. no change to use, egress or occupancy.
This application is filed for a Temporary Use Permit for a sales office pursuant to section AC 28-111 and Buildings Bulletin 2010-002. Filed in conjunction with NB # M08011197.
Site grading as per plans filed
This application is filed for a Temporary Use Permit for a sales office pursuant to section AC 28-111 and Buildings Bulletin 2010-002. Filed in conjunction with NB # M08011197.
Site grading as per plans filed
New 13 story building.
New 13 story building.
Structural filing as per plans filed
Structural filing as per plans filed