Hereby filing to remove and install sprinkler heads with related piping for apartment renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Sprinkler work as shown on plans filed herewith. No change in use, egress, or occupancy
Conversion of existing standpipe to dry air pressurized system.
Relocation & addition of sprinklers to serve new configuration as per plans. No change in use, egress or occupancy.
Modification of sprinklers as per plans. no change in use, egress or occupancy.
Temporary Standpipe for construction as per plans filed.
Sprinkler and standpipe work as per plans filed.
Installation of temporary sprinkler protection for construction renovation.
This Alteration is being filed for the installation of new Sprinkler system at the subject premises as per plans submitted herewith. There are no change of use, egress or occupancy…
Filing herewith for the new installation and relocation of sprinkler heads. There is no change to use, egress of occupancy.
The scope of work consists of: relocation of an existing standpipe as depicted in the plans. no change of use, egress or occupancy under this application.
Hereby filing to relocate sprinkler heads with related piping as shown on plans filed herewith. No change to use, occupancy or egress.
Propose Sprinkler and Standpipe works for 70-story mix-used building filed in conjunction with NB # M00643592-I1.
Sprinkler heads installation for the townhouse as per plans filed herewith. no change to use, egress or occupancy.
Modifications to existing sprinkler system for ph renovations.
Proposed Temporary Standpipe design for a 69-story new building filed in conjunction with NB-GC # M00643592-I1.
Sprinkler modifications taking place on the 33rd floor (36th floor marketing) as indicated on the drawings.
Filing herewith plumbing work for the renovation of the 7th floor, 8th floor and of at the address noted.
Sprinkler modifications taking place on the 1st and 3rd floor as per drawings filed herewith. no change in use, egress or occupancy.