Installation of new combined class i manual wet standpipe and automatic we sprinkler system for new building as per nyc bc 2022, nfpa 13 2016, nfpa 14 2016 & nfpa 20 2016 all as am…
Application being filed for the installation, relocation, and replacement of Sprinkler fixtures as per plans filed herewith. No change in use, egress, or occupancy.
Modification of existing sprinkler system
New sprinkler heads at existing rectory at 5th floor. connect to existing sprinkler riser.
Installation of Temporary Manual Dry Standpipe System
Modifications to existing sprinkler system in Apt. 4 as per plans filed herewith. No change in use, egress, or occupancy.
Installation of a temporary core sprinkler protection system for unit 1401. No change in use egress or occupancy.
Filing for sprinkler work associated with interior demo of 19th floor as per plans submitted herewith.
Installation of Sprinkler and Standpipe Systems in conjunction with New Building.
Filing herewith temporary standpipe system in conjunction with new building
Installation of a new sprinkler system for a single family home. Removal of existing sprinkler heads in egress stair. No change to use, occupancy or egress.
Installation of new sprinkler system.
Installation temporary standpipe system in conjuction with alt co # m00769995.
Temp standpipe in conjunction with nb application b00975270-i1
Sprinkler Systems modification related to Hotel Lobby Renovation per plans filed herewith. No change in occupancy, use or egress.
Sprinkler application filed as per plan provided replacement and relocation of existing sprinkler heads per new architectural layout.
Plumbing work in conjunction with the superficial renovation of apartment 14e on the 14th floor. no change in use, occupancy, or egress.
Sprinkler modifications related to Restaurant Renovation.
Modifications to sprinkler systems as per plans filed herewith filed in conjunction with NB #M00505081.. No change of use, occupancy or egress.