Maric Mechanical Inc
Permits (399)
Installation of construction fence to protect publicfrom work areas.
Installation of construction fence to protect publicfrom work areas.
Installation ofthe newconcrete padsfor mech.equipment intank rooms andboilerroom.createnew opening inthe exterior masonry walls. repair various concrete elements ofthetank roomsand boiler room.
Renovation of cellar boiler room - nycha boilers. work includes -install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes.
Filing for civil work related to concrete pad placement.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Filing for pad extension related to boiler replacement/removal per plans filed. no change to use, egress or occupancy.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Renovation of cellar mechanical equipment room - nycha boilers
Renovation of cellar mechanical equipment room - nycha boilers. work includes install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes
Mechanical Design for: 1) Replacement of chillers and demolition of cooling towers 2) Installing fully variable reheat hot water system 3) Upgrading BMS 4) Recovering waste heat from the cold storage...
Replacement of HVAC equipment (Vacuum pump, condensate pump)
1) Replacement of existing roofing on upper and lower-level roofs, not including the existing deck to remain. 2) Modification of existing and provision of new roof level access stairs as indicated.
Nycha lafayette houses (building #2), installation of temporary stack connected to mobile boilers and mounted on the facade in conjunction with dob # b00994757 and b01280426. no change in egress, use,...
Installation of temporary shoring in order to remove an underground storage tank
1) Analysis of existing roof dunnage for new roof top equipment and design of existing steel dunnage modifications accordingly. 2) The Design of new steel dunnage platform for additional equipment.
Installation of the new concrete pads for mech. equipment in tank rooms. installation of new concrete area ways at tank rooms. extension of existing sump pit.
Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls.repair various concrete elements of the tank rooms & boiler roo...
1) Analysis of existing roof dunnage for new roof top equipment and design of existing steel dunnage modifications accordingly. 2) The Design of new steel dunnage platform for additional equipment.
1) Replacement of existing roofing on upper and lower-level roofs, not including the existing deck to remain. 2) Modification of existing and provision of new roof level access stairs as indicated.