Maric Mechanical Inc
Permits (399)
Filing for associated pumps for replacement of domestic hot water system per plans filed herewith. all plumbing and gc work to be filed under separate application. no change to use, egress or occupanc...
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Installation of the new concrete pads for mech. equipment in tank rooms. installation of new concrete area ways at tank rooms. extension of existing sump pit.
Renovation of cellar mechanical equipment room - nycha boilers. work includes install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes
Renovation of cellar mechanical equipment room - nycha boilers
Installation of construction fence to protect publicfrom work areas.
Filing for civil work related to concrete pad placement.
Installation ofthe newconcrete padsfor mech.equipment intank rooms andboilerroom.createnew opening inthe exterior masonry walls. repair various concrete elements ofthetank roomsand boiler room.
Installation of temporary shoring in order to remove an underground storage tank
Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls.repair various concrete elements of the tank rooms & boiler roo...
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Nycha lafayette houses - building #2, installation of +/- 700 linear feet of temporary 8 feet high chain link fence submitting on behalf of contractor in conjunction with dob # b00994757. no change in...
Nycha lafayette houses (building #2), installation of temporary stack connected to mobile boilers and mounted on the facade in conjunction with dob # b00994757 and b01280426. no change in egress, use,...
1) Analysis of existing roof dunnage for new roof top equipment and design of existing steel dunnage modifications accordingly. 2) The Design of new steel dunnage platform for additional equipment.
1) Replacement of existing roofing on upper and lower-level roofs, not including the existing deck to remain. 2) Modification of existing and provision of new roof level access stairs as indicated.
Mechanical Design for: 1) Replacement of chillers and demolition of cooling towers 2) Installing fully variable reheat hot water system 3) Upgrading BMS 4) Recovering waste heat from the cold storage...
Renovation of cellar mechanical room - nycha boilers replacement. work to include: install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes.
Filing for louver replacement, minor facade repair of existing masonry disturbed by louver replacement and pad extension related to boiler replacement/removal per plans filed. no change to use, egress...
Installation of steam unit heater for boiler replacement. no change to use, egress or occupancy.
Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls. ew concrete area ways at tank rooms.