Proposed seismic bracing for sprinkler & standpipe (only). in conjunction with nb application m00936068-i1 as per plans filed herewith.
SOE for Weatherproofing
New 1 story building for mechanical boiler room.
Q116 - sub-slab depressurization system
Q116 - Civil work related to NB
Herewith filing for new seismic braces installation for electrical.
Herewith filing for new seismic braces installation for fuel oil piping. no change in use, egress or occupancy.
Magni rth 6.35sh/8.25 telescopic handler used to load/unload materials
Q116- 4-story new school building
Herewith filing subsequent Structural document in conjunction with NB Q08012928-I1
Construction Fence in conjunction with 1 story new building at Polo Ground NYCHA Houses.
Nycha boiler - interior renovation to boiler room space and minor exterior work for boiler equipmentremoval. no change to use, egress or occupancy.
Construction of 1 story new building for new pneumatic waste collection system for the polo grounds nycha campus in harlem. related applications to be filed as subsequent applicati…
Filing for the following at the polo grounds towers 1, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.
Saint john villa: subsequent geothermal work type for phase ii site preparation of a new school complex. application filed in conjunction with dob # s01144839, s01149913, 500877063
Filing for the following at the polo grounds towers 4, a new waste collection room will replace the existing incinerator rooms. no change to use, egress or occupancy.