Navillus Tile Inc
Permits (66)
Construction fence filed in conjunction with 4 story new school building and all related applications.
Herewith filing subsequent Structural document in conjunction with NB Q08012928-I1
Herewith filing subsequent Earthwork/Foundation document in conjunction with NB
St. john villa: subsequent filing of foundation, structural and general construction work types for site preparation of a new school complex. application filed in conjunction with dob # s01144839, s01...
St. john villa: subsequent filing of foundation, structural and general construction work types for site preparation of a new school complex. application filed in conjunction with dob # s01144839, s01...
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
ST. JOHN VILLA: Subsequent filing of Earthwork and Civil General Construction for site work preparation of a new school complex. JOB FILED IN CONJUCTION S01144839, S01149913, 500877063
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
ST. JOHN VILLA: Subsequent filing of Earthwork and Civil General Construction for site work preparation of a new school complex. JOB FILED IN CONJUCTION S01144839, S01149913, 500877063
HUB Consultation Accepted. Construction of a 5 Story Educational Structure with Roof and Roof Terraces with Entrance along Division Road. The Design of the Secondary Connection shall be phased and sho...
Saint john villa: general construcion work type for phase ii site preparation of a new school complex. applicarion filed in conjunction with dob # s01144839, s01149913, 500877063
Saint john villa: general construcion work type for phase ii site preparation of a new school complex. applicarion filed in conjunction with dob # s01144839, s01149913, 500877063
HUB Consultation Accepted. Construction of a 5 Story Educational Structure with Roof and Roof Terraces with Entrance along Division Road. The Design of the Secondary Connection shall be phased and sho...
Support of Excavation for 5 Story NB NY Harbor School Annex.
Supported scaffold in conjunction with 5 story new school building.
M533 : 800 Division Road : Installation of Mechanical Systems including Ventilation, Cooling, heating and Dehumidification System associated units, ductwork, fittings, anchors
M533 : Installation of a Package Type Emergency Generator with Built-in 275 Gallon Belly Tank.
Installation of temporary fence as per plans. fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Nycha boiler - foundation and structural work for new mechanical boiler room 1 story building.
Proposed scaffold in conjunction with 4 story new school building addition.