Safepipe Plumbing Inc
Permits (65)
Plumbing work in conjunction with new building construction
To file PL plumbing work in conjunction with DOB Now Build application job#M01311381-I1. No change in use, egress or occupancy under this application.
Application filed for underground plumbing work as per plans.
Application filed for underground plumbing work as per plans.
Apartment renovation including minor wall relocations, bathroom and kitchen replacement.
Install boiler and h.w.h. for 3 family dwelling in cellar floor. plumbing work as per plan. no change in egress, use or occupancy.
Apartment renovation including minor wall relocations, bathroom and kitchen replacement.
Install boiler and h.w.h. for 3 family dwelling in cellar floor. plumbing work as per plan. no change in egress, use or occupancy.
Plumbing application filed subsequent to NB application: Q01288509-I1.
Plumbing application filed subsequent to NB application: Q01288509-I1.
Filed herewith for plumbing application in conjunction to q01309294-i1. no change to use, occupancy or egress.
Filed herewith for plumbing application in conjunction to q01309294-i1. no change to use, occupancy or egress.
Install (1) shower, (1) water closet, (1) lavatory, (1) washing machine, (1) dryer and (1) slop sink in the Cellar. No change in use, occupancy or egress.
Installation of combined sprinkler/standpipe system as per plans filed.
Installation of combined sprinkler/standpipe system as per plans filed.
Installation of temporary dry standpipe alarm system during construction as per plans filed.
Installation of combined sprinkler/standpipe system as per plans filed.
Installation of temporary dry standpipe alarm system during construction as per plans filed.
Install (1) shower, (1) water closet, (1) lavatory, (1) washing machine, (1) dryer and (1) slop sink in the Cellar. No change in use, occupancy or egress.
Replace existing pl fixtuers with new as per drawings. no change to use, occupancy or egress proposed under this application.