Spring Scaffolding Llc
Permits (299)
Installation of temporary construction barriers as per plan. no change in use, egress or occupancy.
North hoists-cars 1&2: equipment use: dual 7400# capacity personnel/material hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at washington street and carlisle street elevations..
Installation of temporary chimney protection per plan. no change in use, egress, or occupancy. the 4 chimneys rptoection on 109 washington st and 1 chimney protection on 110 greenwich st.
Installation of temporary roof protection per plan. no change in use, egress, or occupancy. the roof protection at neighbor roof at 109 washington street and 110 greenwich street.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold at the south (west 63rd st) and west elevations from the top of the sidewalk shed to past...
Installation of temporary roof protection/overhead protection as per plan. no change in use, egress, or occupancy. the roof protection and overhead protection at the east neighbor's roof. the ovh over...
Installation of temporary work platform as per plan. no change in use, egress, or occupancy. the work platform on the 17th floor at the southeast corner allows customers to land the suspended scaffold...
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy. the pipe scaffold on broadway and 5th avenue elevation from the top of the sidewalk shed past the main roof...
Installation of temporary plywood enclosure as per plan.
Install of temporary window protection per plan. no change in use, egress, or occupancy. the window protection on 4 windows on the s elev at 110 greenwich st and w elev 108 greenwich st, 14 windows on...
Installation of temporary plywood fence as per plan. no change in use,egress, or occupancy.
Installation of temporary roof protection as per plan. no change in use, egress or occupancy.
Installation of temporary overhead protection as per plan. no change in use, egress, or occupancy
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.