Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary custom color splywood fence as per plan. no change in use, egress, or occupancy.
Installation of temporary roof and overhead protection as per plan. no change in use, egress or occupancy.
Installation of temporary plywood fence as per plan. there is no change in use, egress, or occupancy.
Installation of temporary roof protection as per plan. no change in use, egress, or occupancy. the roof protection east neighbor's rear 3rd floor and west neighbor's roof elevation…
Use of temporary knuckle boom construction equipment as per plans filed herewith. This application is filed in conjunction with NB X00968343-I1.
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress, or occupancy under this application. the…
Installation of temporary overhead protection as per plan. no change in use, egress, or the overhead protection is at the southwest neighbor's backyard and the northwest neighbor's…
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy
Use of mini crane for hoist common platform assembly.
Installation of temporary custom color sidewalk shed as per plan. there is no change in use, egress, or occupancy of the sidewalk shed at west 57th street, including extensions pas…
Installation of overhead protection as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
sidewalk shed installed per plans, no change in use, egress or occupancy
Installation of temporary overhead protection as per plan. no change in use,egress, or occupancy. the overhead protection is west, south over the mechanical units, and east consist…
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.