Permits (787)
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy of the sidewalk shed at frederick douglass lbvd and west 113rd street elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at the front of the building, west 63rd street, and west neighbor garage ramp elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy of the sidewalk shed at frederick douglass lbvd and west 113rd street elevations.
Installation of temporary roof and overhead protection as per plans. no change in use, egress or occupancy.
Sidewalk shed proposed installation of sidewalk shed as per plan. no change in use,egress or occupancy.
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Installation of temporary barricade as per plan. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Equipment use: dual 7000 # capacity personnel hoist during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elev...
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed at the east neighbor's (162 e 80th st) side yard property line.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is at pine, nassau, wall street elevations.
Installation of pipe scaffold shed as per plan. no change in use, egress or occupancy.
sidewalk shed installed per plans, no change in use, egress or occupancy
Installation of temporary crash deck as per plan. no change in use,egress or occupancy
Installation of temporary construction plywood fence as per plan. no change in use, egress or occupancy.
Installation of temporary needle beam as per plan. no change in use,egress or occupancy
Sidewalk shed installed per plans , no change in use, egress or occupancy
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is top of the sidewalk shed and passes the main roof parapet wall, building front of the...