Equipment use: dual 7000 # capacity personnel hoists during bldg alteration, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under t…
Installation of sidewalk shed as indication the attached drawings. There are no changes in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary material hoist as per plan. there is no change in use, egress, or occupancy. the materail hoist at the lexington avenue (front) elevation from the top of…
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy.
Installation of temporary overhead protection as per plan. no change in use, egress or occupancy.
Installation of temporary work platform per plan. no change in use, egress, or occupancy. the work platform is on top of the interior stairs and elevator shaft.
Filing amendment to amend the plans
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2014 code. no change in use, egress or occupancy under this application.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold top of t he sidewalk shed front of the building at west 16th street e…
Installation of temporary roof protection as per plan. no change in use, egress, or occupancy.