Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary overhead protection as per plan. no change in use, egress, or occupancy
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy
Sidewalk shed installed per plans, no change in use, egress or occupancy
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress , or occupancy. the pipe scaffold on the front elevation of the building from the top of the sidewalk…
Installation of temporary work platform per plan. no change in use, egress, or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is in front of the building at east 79th street.
Equipment use: installation of dual 5460# capacity personnel hoists during nb filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under…
Installation of temporary barricade with chain link fence as per plan. there is no change in use, egress, or occupancy. the plastic barricade with chain link fence at west 43rd str…
Installation of temporary barricade as per plan. no change in use,egress or occupancy.