Structural Modifications: Install new structural steel at existing interconnecting stair to support new glass guardrail between the 17-18th Floors as per plans (Lowenstein Sandler…
Modifications to the existing HVAC System: Install new ductwork, chilled water system, associated insulation, VAVs, (2) CRAH units, (1) Chilled Water FCUs, Condensate Pump/Drain Pa…
New low temperature hot water scope for future areas. new piping connections to be made on upper floors within the building, under seperate application. there is no change in use,…
Filing for interior structural modifications to framing between Cellar and 1st Floor for MEP support. New concrete pads for MEP equipment in Cellar. No change in use, egress, or oc…
Hereby filing to Patch and repair existing roofing and modify existing guardrail, for installation of building maintenance unit infrastructure as shown on plans filed herewith. NO…
Hereby filing removal of mechanical equipment and associated ductwork and piping as shown on plans filed herewith. no change to use, occupancy or egress.
Selective removal of the existing facade on pine st and wall st, g-l05. removal of interior finishes on floors g-l1. no interior demolition on floors l2-l5. no change in use, egres…
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Filing for installation of HVAC units in Cellar and associated ducts and piping throughout Cellar to Floor 8 for future fit-out connections as per plans filed herewith. No change i…
Removal of selective structural slabs from ground level to l05 mer.. no change in use, egress or occupancy.