Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Interior renovation of 9th floor commercial space as per plans filed herewith.
General Construction to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
General construction alterations on the 1st thru 3rd floors, cellar, and roof levels for proposed change of use/occupancy; related work as per plans.
Interior build out of partial floor as shown on drawings. No change in use, egress or occupancy.
Support-of-excavation for new elevator pit.
Addition and/or alteration - for the level ii interior alterations for the tenant fit-out of assembly occupancy (a2) on partial first floor of an existing building. alterations to…
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Alt Co filed to include accessory Terrace on CO and to increase population on the 20th construction/ 21st marketing floor
General construction modifications taking place on the 2nd floor as per plans filed herewith. No change in use, egress or occupancy