Tri City Mechanical Group
Permits (105)
To install plumbing fixtures as per plan.
To install plumbing fixtures as per plan.
APPLICATGION FILE TO INSTALL PLUMBING FIXTURES & ELECTRIC PIZZA OVEN AT PARTIAL 1st FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
APPLICATGION FILE TO INSTALL PLUMBING FIXTURES & ELECTRIC PIZZA OVEN AT PARTIAL 1st FLOOR AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Direct replacement of plumbing fixture in kitchen, and in 2 bathrooms, and the removal and the replacing of bathtub after capping it with a closet in apt#940
Plumbing work filed in conjunction with Alt-Co application
Plumbing work filed in conjunction with Alt-Co application
Direct replacement of plumbing fixture in kitchen, and in 2 bathrooms, and the removal and the replacing of bathtub after capping it with a closet in apt#940
Install gas and plumbing fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Install gas and plumbing fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Cap and remove fixtures and pipings
Herewith filing plumbing work to a ada bathroom and resolve dob ecb violation #35719565m for spa use at 2nd floor. no change to existing use, egress or occupancy.
Herewith filing plumbing work to a ada bathroom and resolve dob ecb violation #35719565m for spa use at 2nd floor. no change to existing use, egress or occupancy.
Cap and remove fixtures and pipings
Remove existing plumbing fixtures as per plans
Install 1 new boilers, 1 hwh, 1 washer and 1 dryer in the existing 2 story building. replace kitchen and bathroom fixtures. plumbing work as per plan. no change in egress, use, or occupancy.
Install new plumbing fixtures on 1st and 2nd floors
Plumbing work in apt 12c
Plumbing work filed in conjunction with interior renovation of the residential units
Remove existing plumbing fixtures as per plans