Direct replacement of plumbing fixture in kitchen, and in 2 bathrooms, and the removal and the replacing of bathtub after capping it with a closet in apt#940
Plumbing work filed in conjunction with Alt-Co application
Install gas and plumbing fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Cap and remove fixtures and pipings
Herewith filing plumbing work to a ada bathroom and resolve dob ecb violation #35719565m for spa use at 2nd floor. no change to existing use, egress or occupancy.
Plumbing work filed in conjunction with interior renovation of the residential units
Install new plumbing fixtures on 1st and 2nd floors
Install 1 new boilers, 1 hwh, 1 washer and 1 dryer in the existing 2 story building. replace kitchen and bathroom fixtures. plumbing work as per plan. no change in egress, use, or…
Remove existing plumbing fixtures as per plans
Plumbing work in apt 12c
Installation of new plumbing fixtures and risers in commercial space.
Job filed exist. commercial store install new cooking equipment and plumbing fixture perplan. no change of use, egress or occupancy under this application.