Turner Construction Compa
Permits (122)
Construction of New Commercial High Rise Building. NYC Development HUB Consultation on 8.11.2021. ENERGY MODELING SUBMITTED UNDER MECHANICAL SUBSEQUENT FILING M00615380-S5.
Additions & modifications to structural members as shown on drawings. Filed in conjunction with NO WORK - ALT I BIS # 123907512. Related general construction filed under DOB NOW #M00450660. No change...
The scope of structural work for being filed herin is to provide supportfor future grade-level work onto the existing building foundations and to install framing modifications in association with the...
Alteration co (type i) for change of use on the 7th floor and updated certificate of occupancy to reflect floors 1-9 and roof. this is general construction for alt i bis# 123907512.
Construction of New Commercial High Rise Building. NYC Development HUB Consultation on 8.11.2021. ENERGY MODELING SUBMITTED UNDER MECHANICAL SUBSEQUENT FILING M00615380-S5.
Alteration co (type i) for change of use on the 7th floor and updated certificate of occupancy to reflect floors 1-9 and roof. this is general construction for alt i bis# 123907512.
The scope of structural work for being filed herin is to provide supportfor future grade-level work onto the existing building foundations and to install framing modifications in association with the...
Additions & modifications to structural members as shown on drawings. Filed in conjunction with NO WORK - ALT I BIS # 123907512. Related general construction filed under DOB NOW #M00450660. No change...
Structural modifications as per plans filed herewith. No change to use, egress, or occupancy is proposed.
Structural modifications as per plans filed herewith. No change to use, egress, or occupancy is proposed.
New air distribution from existing AC unit to revised layout, new ductwork and air outlets, new energy valves for the condenser water for future tenants. New kitchen exhaust ductwork and make-up air d...
Structural steel framing for new floor openings, wind screen and stair enclosure, new concrete topping slab.
Structural modifications taking place on the 16th fl construction/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy Bridgewater Terrace
Structural modifications taking place on the 16th fl construction/17th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy Bridgewater Terrace
Structural steel framing for new floor openings, wind screen and stair enclosure, new concrete topping slab.
New air distribution from existing AC unit to revised layout, new ductwork and air outlets, new energy valves for the condenser water for future tenants. New kitchen exhaust ductwork and make-up air d...
Modification to existing mechanical system and related piping. installation of new a/c unit to be mounted on existing dunnage. and new a/c units on the 6th floor no change to use egress or occupancy.
Structural work as shown on drawing.no change to use, egress or occupancy.
Interior renovaton on 6th floor and mezzanine filed in conjunction with alt 1 job number m01303164-i1 as shown on drawings. no change to use, egress or occupancy.
Interior renovaton on 6th floor and mezzanine filed in conjunction with alt 1 job number m01303164-i1 as shown on drawings. no change to use, egress or occupancy.