Structural work on the 11th floor (Tai Ping Edward Fields showroom) as indicated on drawings.
Filing herewith phased structural construction of 343M to include one-story structure on north side of site and associated below grade basements and foundations
Support of excavation for the construction of proposed elevator pits, grease interceptor and sump pit and column B1 expansion in the Cellar Level as per plans (Project Ruby.) No change to use, egress...
Filing herewith for below-grade basements and foundations work as per plans. The proposed work is previously approved under NB M00615380. This Application is being filed to separate MTA processing and...
Filed herewith for Interior & Exterior renovation for the MTA Box. Construction of an entrance to the LIRR Grand Central Madison concourse. Installation of non load bearing partitions, ceilings, floor...
Mechanical work on the 6th and 7th floors as plans filed herewith. no change in use, egress, or occupancy.
Filing herewith for below-grade basements and foundations work as per plans. The proposed work is previously approved under NB M00615380. This Application is being filed to separate MTA processing and...
Filed herewith for Interior & Exterior renovation for the MTA Box. Construction of an entrance to the LIRR Grand Central Madison concourse. Installation of non load bearing partitions, ceilings, floor...
Mechanical work on the 6th and 7th floors as plans filed herewith. no change in use, egress, or occupancy.
Support of excavation for the construction of proposed elevator pits, grease interceptor and sump pit and column B1 expansion in the Cellar Level as per plans (Project Ruby.) No change to use, egress...
Install new rooftop AC units for ventilation and kitchen exhaust, Install new outdoor/indoor VRF system, ductwork, refrigerant piping on the cellar, 1-3 and roof as per plans (Project Ruby/ Buildout P...
Install new rooftop AC units for ventilation and kitchen exhaust, Install new outdoor/indoor VRF system, ductwork, refrigerant piping on the cellar, 1-3 and roof as per plans (Project Ruby/ Buildout P...
General construction for Liberty Mutual on 10th floor
General construction for Liberty Mutual on 10th floor
Alteration Type one for addition as per plans.
Alteration Type one for addition as per plans.
Mechanical work on the 11th floor (suite 1101-Tai Ping/Edward Fields showroom) as indicated on drawings.
Modification to HVAC system as per plans filed herewith.
Modification to HVAC system as per plans filed herewith.