Varsity Plbg And Htg Inc
Permits (106)
plumbing work to accommodate roof project
Disconnect and remove existing sink, and provide new fixtures at the locations shown on drawnigs and reconect to the existing main pipies.
Plumbing work associated with roofing - replacement of roof drains at same location. installation of chimney trap primer at cellar.
plumbing work to accommodate roof project
Remove and replace 14 existing roof drains related to roof replacement
New sanitary and storm scope of work for new addition and modifications to several existing plumbing fixtures in areas to be made accessible. PAA description in comments
Remove and replace existing roof drains with associated piping. Remove and relocate plumbing vent pipes to be at least 3 feet from the face of any nearby equipment curbs.
Remove and replace existing roof drains and connect to existing piping. Remove and replace vents above roof surface to maintain the minimum 24 above finished roof surface
Remove and replace existing roof drains with associated piping. Remove and relocate plumbing vent pipes to be at least 3 feet from the face of any nearby equipment curbs.
Remove and replace existing roof drains and connect to existing piping. Remove and replace vents above roof surface to maintain the minimum 24 above finished roof surface
New sanitary and storm scope of work for new addition and modifications to several existing plumbing fixtures in areas to be made accessible. PAA description in comments
Replace existing drinking fountains with new drinking fountains & associated accessories & piping.
Replace existing drinking fountains with new drinking fountains & associated accessories & piping.
Replacement of 14 existing roof drains in place as part of roof replacement. The relocation of 5 roof drains away from the wall. All roof drain piping removed and replaced to the first elbow.
PS 188K: Plumbing work to relocate gas pipe, add 2 floor drains, trap primer and 1 hose bib. Sprinkler work to reroute a section of 2-inch pipe. No change to use, egress or occupancy.
Replacement of 14 existing roof drains in place as part of roof replacement. The relocation of 5 roof drains away from the wall. All roof drain piping removed and replaced to the first elbow.
PS 188K: Plumbing work to relocate gas pipe, add 2 floor drains, trap primer and 1 hose bib. Sprinkler work to reroute a section of 2-inch pipe. No change to use, egress or occupancy.
Replacement of roof drains and drain piping in conjunction with roof and exterior repairs. no change to use, egress, or occupancy.
Replacement of roof drains and drain piping in conjunction with roof and exterior repairs. no change to use, egress, or occupancy.
Remove and replace 7 roof drains and associated piping. Extend 9 roof vents. Remove and replace 3 catch basins.