Preparation Work for Full Demolition - Removal of Glass Windows
Wall Ties to allow full demolition of 40 East 52nd Street building
Demolition of detached commercial building.
Interior demolition of non load bearing partitions on the 14th floor (NorthSide) as indicated on drawings.
Inteior demolition of non load bearing partitions on the 31st floor (north/northeast corner) as indicated on drawings.
Interior demolition for Suite A on 1st floor
Interior demolition of non load bearing partitions on the 40th floor as indicated on drawings.
Removal of mechanical duct work, kitchen hood and related kitchen exhaust on the 40th floor and roof as indicated on drawings.
Removal of non bearing partitions and related finishes as per plans filed within. No change in use, egress or occupancy.
Herewith Filing for the removal of an existing mezzanine (MZ1) as refenced on plans .
Herewith Filing interior demolition of existing eating and drinking establishment as per plans. No Change in Use, Egress or Occupancy is proposed.
Interior demolition of non load bearing partitions on the 8th floor as indicated on drawings.
Scope of work includes interior demolition of partitions and finishes on the 9th floor as indicated on plans. no change in occupancy, use or egress.
Scope of work includes interior demolition of partitions and finishes on the 4th floor as indicated on plans. no change in occupancy, use or egress.
Interior demo at 15th and 17th floors. No change in use, occupancy, or egress.
Sidewalk Shed for Full Building Demolition
Field Offices and Worker Shanties
Use of mechanical demolition equipment during partial demolition, filed separately under m08050795