Permits (38)
Preparation Work for Full Demolition - Demolition of West Facade for Abatement Access
Preparation Work for Full Demolition - Removal of Glass Windows
Interior demolition of non load bearing partitions on the 21st floor (SW corner, former EyeBio) as indicated on drawings
Interior demolition of non load bearing partitions on the 21st floor (southside-former Lock8) as indicated on drawings.
Interior demolition of non load bearing partitions on the 27th floor (former Orchestrade ) as indicated on drawings.
Interior demolition of non load bearing partitions on the 10th floor (part of northside suite) as indicated on drawings.
Interior demolition of non load bearing partitions on the 15th floor (NE corner) as indicated on drawings.
Engineered Enclosure System on Scaffolding for Full Building Demolition
Partial Demolition of East Facade to create access opening for construction hoist
Preparation Work for Full Building Demolition - Interior Demolition
Removal of mechanical ductwork and AC units on the cellar and 5th floor as indicated on drawings
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings
Installation of shoring for truck corridor
Modifications to existing HVAC as per plans filed herewith. No change in use, egress or occupancy under this application
removal of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Preparation Work for Full Demolition - Interior Demo
Interior demolition of non load bearing partitions on the basement and 1st floor as indicated on drawings.
Existing concrete built-up areas to be removed. apply floor leveling to existing structural slab. all plans filed as herewith.
Preparation Work for Full Demolition - Removal of Rooftop Equipment
Interior demolition of non load bearing partitions on the 4th floor as indicated on drawings.