Interior demolition of non load bearing partitions on the 8th floor as indicated on drawings.
Scope of work includes interior demolition of partitions and finishes on the 9th floor as indicated on plans. no change in occupancy, use or egress.
Scope of work includes interior demolition of partitions and finishes on the 4th floor as indicated on plans. no change in occupancy, use or egress.
Interior demo at 15th and 17th floors. No change in use, occupancy, or egress.
Sidewalk Shed for Full Building Demolition
Field Offices and Worker Shanties
Bracing for partial demolition for 47- story building renovation cellar to level 7 as per plans
Use of temporary construction equipment as per plans filed herewith. This application is filed in conjunction with DOB-M00767025.
Use of mechanical demolition equipment during partial demolition, filed separately under m08050795
Partial demolition means & methods for structural demolition, filed separately under m00710295.
Means & methods for partial demo of nonstructural elements such as ceilings & partitions. this application is filed in conjunction with the primary application filed under m0069056…
Installation of shoring to allow for partial removal of drop slab panels and chopping of column capitals. structural work filed separately.
Structural work to remove the 2nd floor mezzanine as indicated on drawings.
Interior demolition of non load bearing partitions on the 2nd floor and 2nd mezzanine level as indicated on drawings.
Interior demolition of non load bearing partitions on the 40th floor as indicated on drawings.
General construction modifications taking place on the 15th - 16th floors as per drawings filed herewith. no change in use, egress or occupancy.
Preparation Work for Full Demolition - Removal of Glass Windows
Preparation Work for Full Demolition - Demolition of West Facade for Abatement Access