W5 Group Llc
Permits (77)
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings
Installation of shoring for truck corridor
Installation of shoring for truck corridor
Removal of mechanical ductwork and AC units on the cellar and 5th floor as indicated on drawings
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings
Modifications to existing HVAC as per plans filed herewith. No change in use, egress or occupancy under this application
Modifications to existing HVAC as per plans filed herewith. No change in use, egress or occupancy under this application
removal of non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Preparation Work for Full Demolition - Interior Demo
Interior demolition of non load bearing partitions on the basement and 1st floor as indicated on drawings.
Interior demolition of non load bearing partitions on the basement and 1st floor as indicated on drawings.
Preparation Work for Full Demolition - Interior Demo
Existing concrete built-up areas to be removed. apply floor leveling to existing structural slab. all plans filed as herewith.
Supported Scaffolding for Full Building Demolition
Existing concrete built-up areas to be removed. apply floor leveling to existing structural slab. all plans filed as herewith.
Preparation Work for Full Demolition - Removal of Rooftop Equipment
Preparation Work for Full Demolition - Removal of Rooftop Equipment
Interior demolition of non load bearing partitions on the 4th floor as indicated on drawings.
Interior demolition of non load bearing partitions on the 4th floor as indicated on drawings.
Preparation Work for Full Demolition - Equipment Use for Interior Demo