Use of mechanical demolition equipment during partial demolition, filed separately under m08050795
Installation of shoring to allow for partial removal of drop slab panels and chopping of column capitals. structural work filed separately.
Use of temporary construction equipment as per plans filed herewith. This application is filed in conjunction with DOB-M00767025.
Bracing for partial demolition for 47- story building renovation cellar to level 7 as per plans
Partial demolition means & methods for structural demolition, filed separately under m00710295.
Structural work to remove the 2nd floor mezzanine as indicated on drawings.
Interior demolition of non load bearing partitions on the 40th floor as indicated on drawings.
Interior demolition of non load bearing partitions on the 2nd floor and 2nd mezzanine level as indicated on drawings.
General construction modifications taking place on the 15th - 16th floors as per drawings filed herewith. no change in use, egress or occupancy.
Preparation Work for Full Demolition - Removal of Glass Windows
Preparation Work for Full Demolition - Demolition of West Facade for Abatement Access
Interior demolition of non load bearing partitions on the 21st floor (SW corner, former EyeBio) as indicated on drawings
Interior demolition of non load bearing partitions on the 21st floor (southside-former Lock8) as indicated on drawings.
Interior demolition of non load bearing partitions on the 27th floor (former Orchestrade ) as indicated on drawings.
Interior demolition of non load bearing partitions on the 10th floor (part of northside suite) as indicated on drawings.
Interior demolition of non load bearing partitions on the 15th floor (NE corner) as indicated on drawings.