Interior demolition of non load bearing partitions on the 15th floor (NE corner) as indicated on drawings.
Interior demolition of non load bearing partitions on the 10th floor (part of northside suite) as indicated on drawings.
Engineered Enclosure System on Scaffolding for Full Building Demolition
Partial Demolition of East Facade to create access opening for construction hoist
Preparation Work for Full Building Demolition - Interior Demolition
Removal of mechanical ductwork and AC units on the cellar and 5th floor as indicated on drawings
Installation of shoring for truck corridor
Interior demolition of non load bearing partitions on the cellar and 5th floor as indicated on drawings
Modifications to existing HVAC as per plans filed herewith. No change in use, egress or occupancy under this application