Q420 - Existing School Building - Convert Existing Science Prep Rooms into a new Classroom and Principal's Office.
Remove existing science lab and prep room sinks and associated plumbing piping. Remove gas turrets, MGCV and piping. Provide new Lavatory, water closet and sinks in new Prep Room a…
Remove existing exhaust fan serving the prep room and associated duct. Provide new window AC units for Principal's office, Conference Room and Classroom, new exhaust fan for new pr…
Removals partitions, concrete paving and iron fence removal. new accessible ramp with signage, pipe railings, selective door hardware replacement and partition modification.
Proposed: installation of temporary chain link fence. No change of use, egress or occupancy.
Structural plans filed herewith to show tank replacement in kind; no additional loads considered. No change to use, egress, or occupancy.
Tallman Island WRRF - Dewatering Building. Scope of work: extend air vent pipe above flood protection line (FPL); reroute one process pipe above FPL; extend one fire standpipe; dem…
Replace existing toilet fixtures & existing drinking fountain on the first floor to comply with ada requirement.
Proposed: Hoist installation and use as per plans filed herewith in conjunction with M01244730. No change of use, egress or occupancy.
Q420 - Existing School Building - Path of Travel, Renovation of existing 2nd floor toilet room #236 and Replacement of existing second floor drinking fountain, and replacement of m…
Renovating existing toilet for ADA compliance and replacing existing lighting fixtures with new LED fixtures and provide new lighting controls.
Renovating existing toilet for ADA compliance, remove existing water closets and lavatory and provide new fixtures and modify existing plumbing distribution piping and sanitary pip…
Pot upgrade - interior renovation of existing restroom on the first floor & replace existing drinking fountain on the first floor to comply with ada requirement.
structural work related to boiler plant building, multiple buildings and civil site work, as per plans filed herewith. no change to use, egress, or occupancy.
plumbing modifications related to boiler plant building (package 1) as per plans filed herewith. Gas booster blowers feeding boiler and water feed for boiler make-up water tank are…
mechanical modifications related to the boiler plant building (package 1) as per plans filed herewith. Gas booster blowers feeding boiler and water feed to boiler makeup tank are i…
BLDG #9_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip co…
BLDG #13_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip c…
NYCHA BOILER-CARVER_BLDG #5_Remove and replace duplex vacuum condensate pump set. Provide 2-hr fire rated enclosure, flue gas breaching/flue system and combustion air intake breech…
BLDG #4_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; louver, equip co…