BLDG#12_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas pip...
BLDG#11_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas pip...
BLDG#10_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas pip...
Install fixtures and piping including medical gases to accommodate the new jail building as per plans filed herewith.
Sprinkler work as shown on plans submitted herewith. No changes to use occupancy or egress as of right.
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
Install underground plumbing piping to accommodate the new building.
BLDG#2_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas piping...
BLDG#7_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas pipi...
BLDG#1_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas piping...
X430_Extend existing basement east end sprinkler main into storage areas.
BLDG#4_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas piping...
BLDG#6_Remove exist. steam-fired domestic hot water heat exchanger. Install new gas water heaters and storage tank. Install new gas meter assembly and gas piping to gas water heaters. Remove and repla...
Installation of incoming services for domestic and fire water services to the the new building and sewer connections.
BLDG#3_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas piping...
Sprinkler and Standpipe Installation to accommodate the new building.
NYCHA BOILER-CARVER_BLDG #5_Remove exist steam-fired domestic hot water heat exchanger. Remove & replace sump pump. Install new gas HWHs, storage tank, floor drains and sanitary lines, gas piping. Pro...
Install underground plumbing piping to accommodate the new building.
Sprinkler and Standpipe Installation to accommodate the new building.