Permits (92)
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
Installation of incoming services for domestic and fire water services to the the new building and sewer connections.
Sprinkler work as shown on plans submitted herewith. No changes to use occupancy or egress as of right.
Plumbing work as shown on plans submitted herewith. No change to use, occupancy or egress as of right.
Install underground plumbing piping to accommodate the new building.
BLDG#6_Remove exist. steam-fired domestic hot water heat exchanger. Install new gas water heaters and storage tank. Install new gas meter assembly and gas piping to gas water heaters. Remove and repla...
X430_Extend existing basement east end sprinkler main into storage areas.
BLDG#7_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas pipi...
BLDG#4_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas piping...
Sprinkler and Standpipe Installation to accommodate the new building.
BLDG#2_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas piping...
Building #28: installation of temporary shoring as per plans.
Sprinkler work as shown on plans submitted herewith. No changes to use occupancy or egress as of right.
Plumbing work as shown on plans submitted herewith. No change to use, occupancy or egress as of right.
Building #28: installation of temporary shoring as per plans.
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
NYCHA BOILER-CARVER_BLDG #5_Remove exist steam-fired domestic hot water heat exchanger. Remove & replace sump pump. Install new gas HWHs, storage tank, floor drains and sanitary lines, gas piping. Pro...
NYCHA BOILER-CARVER_BLDG #5_Remove exist steam-fired domestic hot water heat exchanger. Remove & replace sump pump. Install new gas HWHs, storage tank, floor drains and sanitary lines, gas piping. Pro...
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
BLDG #10_Remove/replace vacuum condensate pump. Provide flue gas/combustion air intake breaching/system, motorized dampers, gas leak detection system; new lighting; new Mech Equip Rm-2, equip concrete...