Installation of incoming services for domestic and fire water services to the the new building and sewer connections.
BLDG#1_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter asse…
BLDG#7_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter a…
BLDG#4_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter asse…
BLDG#6_Remove exist. steam-fired domestic hot water heat exchanger. Install new gas water heaters and storage tank. Install new gas meter assembly and gas piping to gas water heate…
BLDG#2_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter asse…
Sprinkler and Standpipe Installation to accommodate the new building.
Install fixtures and piping including medical gases to accommodate the new jail building as per plans filed herewith.
Proposed: temporary standpipe through the building. No change of use, egress or occupancy
Plumbing work as shown on plans submitted herewith. No change to use, occupancy or egress as of right.
X430_Extend existing basement east end sprinkler main into storage areas.
Sprinkler work as shown on plans submitted herewith. No changes to use occupancy or egress as of right.
Install underground plumbing piping to accommodate the new building.
Building #28: installation of temporary shoring as per plans.
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.