Electrical Permits in San Francisco, California
373 electrical permits filed recently
373 permits
remodel bathroom, new cabinets, counters, tile shower pan, same locations, new fixtures and finishes, plumbing and electrical, insulation and sheetrock
powder room replace toilet, sink, tile to bring up to code. electrical and plumbing in kind. master bathroom: replace toilet, sink, tub to bring up to code. elect. and plumbing in kind.
change of use from retail to tea coffee shop (limited restaurant). add sinks and bar area to current retail space. install 3 compartment sinks, hand sink, mop sink, prep sink. upgrade hot water heater...
removing 3' wide of upper and lower cabinets and doing rough plumbing & electrical for new washer dryer location. install new counter top in that location
install 5 additional exterior light fixtures. connect to existing circuit enclose the meter/panel to protect electrical panel
electrical power upgrade, converting to 3-phase
comply to nov 2025-35932 (e) original 2/f rear yard extension and exterior stairs were fully enclosed and converted into a 2-story extension of approx 13'x12'-6", including internal staircase. new ele...
installation of new fuel cell equipment with associated structural platform support, plumbing and electrical engineering. all exterior work and no modificationsto existing building or use impacted. lo...
unit 714: remove closet & adjoining non weight bearing walls, header above closet will remain & moved approx 3" higher to match adjoining dropped ceiling. no plumbing & electrical work is required
unit 3-kitchen remodel: demo no load bearing wall, replace cabinets, new plumbing and electrical fixtures.
unit# 12: kitchen & bathroom remodel like for like, replacement of two windows in-kind one in bathroom one in kitchen , new electrical upgrade and a new panel, replace dishwasher and applicance.
remove (e) kitchen cabinets & install new cabinets in same location. like for like. reconnect (e) plumbing to sink & dishwasher. no changes to layout, walls, electrical or structural components. all w...
conduit line installation wiring of shed, prefab shed build approx 120sqft or less, main water valve replacement.
fire damaged repair to studio unit t-704 only. scope of work includes interior & exterior finishes windows, doors, applliances, electrical, all like for like
ebiko sushi- 217 montgomery st, small take out food establishment, tenant improvement, new fixtures, finshes, equipment, lighting, plimbing and electrical work. no exterior changes.
replace drywall after electrical rewire in (e) walls. no structural changes layout or use. patch of small holes not entire walls.
remove and replace 3 bathrooms in-kind. replace 2 dry rot damaged sliding rear doors. update electrical and plumbing in kitchen and bathroom. replace non-functioning can lights. no work to facade. no...
studio a- bring (e) stair case to mezzaine to code extending mezz area, remodel bathroom, add mens/womens, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit
studio b - bring (e) stair case to mezzanine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit
studio c- bring (e) stair case to meszzaine to code extending mezz area, remodel bathroom, (n) electrical lighting, new wood floors and carpet, paint, (n) a/c unit