New Construction Permits in San Francisco, California
68 new construction permits filed recently
68 permits
bathtub enclosure remodel in kind. remove damaged tiles, replace new tiles. drywall remove & hardy backer wall underneath. inspect for water damage. put new insulation r15. new building paper. new til...
to erect 3 stories, 2 basments, type v-b, single family residential + adu.
**ab-004** site permit with shared plans for 202506128526 to include new foundation for (n) community facility on the east side of caroline st and 138 ft from north mariposa st.
erect 4-story, type 5b, 2-family residential building, each unit with 3-bedrooms, per sb423.
erect a (n) type v-b, 3-story building with 2 residential units.
site permit-4 of 4, fire department training facility, bldg #c1, c2, c3, c4, c5, c6, and c7, 7-story, type 2b.
6th fl - new construction, mech & elec & structural header for movable walls; power, lighting & signal; install new 37 cooling units, 1 new wshp, new duct
construction of a 1-story, type-v gold maintenance building and administrative offices including associated site work.
erect 12'x24' storage shed on sf golf course.
erect new 4 story type-4 2 unit residence.
revision to underground fire permit 202409110519: underground fire main for the new building.
erect a 3 story, type 5b, single family dwelling plus adu (state) with one basement.
12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture quantities, occupancy l...
15floor/suite 1500. includes demo + new construction of non-str partitions. glazing ceiling, fixtures, finishes, millwood and doors + hardware; mep to be permitted separately.
to erect 2 stories, no basement, type iii-b, light industrial. (building over 2 lots)
to erect a 2-story, type 2a, office building.
erect 1 story, type vb. storage shed on rear side of yard.
erect 4-story 2 unit + 2 adu type 3a residential building.
erect (n) pre-fab type vb 1 story greenhouse.
removal and replacemen interior stairs. all new construction will confirm to 2025 cbc