Pool & Spa Permits in San Francisco, California
230 pool & spa permits filed recently
230 permits
renovation of commercial kitchenm restrooms & entrance to the cafeteria space used by cathedral school for boys. new exit passagaway & alteration to utilities serving the area to be renovated
3/f west bldg: revision to 202509266156 (arch ref 202506189005). demo and revise (e) ductwork and diffusers to accommodate new floor plan layout. furnish and install new duct, diffusers, and terminal...
1st/f: remodel e) floor space to family rm, bedroom, & bathroom. 2nd/f: remodel e) baths & kitchen
abate nov#202545796. enlarge 1/2 bathroom, add a shower. new wet bar, cabinets, refridgerator. fill in existing door detween garage and libing space. convert laundry to storage, move laundry equipment...
3rd fl - selective demo of interior office space to remove millwork, doors, frames, side lights, lighting and ceiling ab-017
8th floor. t.i. including building of (n) non-structural partitions. all new or separately meps, life safety work will be design-buildg and submitted separately for permit. (bldg is fully sprinklered)...
1/f: addition of finishes space w/in footprint of (e) structure and rear deck, a new rear deck and renovations to the kitchen & bathrooms. new interior stairs connecting the 1/f & 2/f is the only exte...
convert (e) storage space on g/f into dwelling unit.
add interior stairs from unit# 1 to basement and convert the storage rooms in the basement into habitable space. add 2 bedrooms and 2 bathrooms. add rear landing, rear firewall, and rear access door f...
merge 2 vacant commercial spacwe ( 2573 & 2575 mission ) to one commercial space (2575 mission st). proposed ti at first fl & reviving the mezzanine to accomodate new restroom/bar, new kitchen, new re...
turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from l...
to repair dry-rot at north wall of 1st floor commercial space, cafe, interior work only, to address complaint#202548311, not facing the street
1st fl & basement improvement: new non structural walls & partitions. new interior finishes, two new bathrooms, one new mother's room with sink, two new sink counters. mep modification. change of use...
1)remodel existing 1st floor including converting 62 sf of storage space to habitable space, enlarge(e) bathroom 2) remodel (e) kitchen at 2nd floor - this project does not remove a unit protectedunde...
additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and clos...
rev 201908068086-s1 & 202508213586:horizontal expanding at g/f to include a bedroom and play room. new g/f deck and stairs to garden below. and new deck above g/f horizontal expansion for floor 2.new...
build horizontal extension to the rear of the (e) ground floor and second floors. build a vertical extension (3rd floor addition) avove the seond floor. preserve the (e) front facade and front exterio...
convert (e) vacant commercial space into state adu.replace (e) wood transom window with operable wood transom that is consistent with the (e) frame.replacmeent of 2 doors and modify door along varenes...
unit 1020 b: interior remodel to include (n) bathroom, space heating and windows at rear of buildling.
37th/f- corridor/ restrooms & lobby: new power & signal devices throughout the space. new 2022 title 24 lighting & controls. ref# 202505144642.