Roofing Permits in San Francisco, California
1,275 roofing permits filed recently
1,275 permits
voluntary structural strengthening at attic and roof framing. adding window change to the front facade.
reroof, tear off 16 sq. torch down.
emergency framing repairs to close roof to prevent additional damage to the apartments. complete repair plans will be submitted separately
re-roof: tear-off existing roof. install new comp singles. (no hot works) approx. 12 sq ft.
reroof with torch down.
a water leak from our roof cause moisture in walls and ceiling on the 2nd&3rd story and in garage and 1st flr bedroom. 1) mitigators removed wet materials (plaster/insulation) from ceiling and walls t...
re-roofing. hot works.
re-roofing. hot works.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroofing - no hot work.
renovate the existing deck-roof top deck.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: demo shingle & flat roof (1 layer) approx 2,500 sq ft, remove all existing vents & flashing, install waterproof under layment approx 1400 sq ft, sloped area, install underlayment flat area...
remove and replace drywall in kind to add insulation. only at 2/f, and only for exterior walls and roof ceiling (invisble from st)
re-roofing: torch down modified bitumen, hot works
re-roofing: demo the old shingles, install new shingles, no hot work.
solar permit: installing 15 solar pv modules, 405 watts per module, total no. of rating 6.075 kw. mounted: roof, ballasted: n | revision to : s20251030278 residential roof mount pv system. system size...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
revision to to pa 202303163798 documentation of existing and proposed gable roof slope tp 10:12 slope (correction from 9:12 roof slope); proposed bldg height increased from 30'-4 1/2" (approved) to 31...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)