Renovation Permits in Minneapolis, Minnesota
484 renovation permits filed recently
484 permits
T/I - "LEVEL 19S REGULATORS" (19TH FLOOR) const type: IA occupancy: B 2020 MSBC occupant load: 199 sprinklered: YES architect: 52351 - Brown, Michael Tipton @ RSP
(DMH - Pdox) INSTALLATION OF BASEMENT EGRESS WINDOW & WELL AT SIDE YARD OF SFD. THIS PERMIT DOES NOT APPROVE A BASMENT BEDROOM, EXISTING FINISHES BUILT WITHOUT A PERMIT, OR WORK OTHER THAN DESCRIBED....
REPAIR/REPLACE VESTIBULE WINDOWS/DOORS BUILDINGS 2433 & 2419 const type: IB occupancy: R2 2020 MSBC architect: 18710 - Adsit, Mina
replace vestibule storefront and doors. certificate of occupancy required: no special inspections required: no const type: 1B occupancy: R-2 2020 MSBC architect: Mina Adsit #18710
(DMH-Pdox) BATHROOM REMODEL IN APT UNIT #120. CONVERT TUB TO SHOWER STALL. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE...
(DMH-Pdox) REMODEL SFD INCLUDING RECONSTUCT INTERIOR STAIRWAYS TO CODE IN OTHER OPPOSITE DIRECTION. SEE ENGINEER DRAWINGS FOR STAIR STRUCTURE AND FASTENING PER TONY TRAN, #53053 (ENGINEERED) REMODEL 2...
Interior remodel. all care rooms to exit directly to exterior. all corridor walls to be 1 hour rated w/ 20 min doors. (jjl) original permit: bldg247196. addition added under bldg227411. 3490 sf. *****...
Remove/replace front entry door. No frame alteration.
T/I "KORN FERRY", 5TH FLOOR, LOOSE WILES BUILDING const type: IB occupancy: B 2020 MSBC architect: 23558 - Walz, Jeffrey Lee @ GENSLER
Front Entrance/Canopy and interior remodel certificate of occupancy required: no special inspections required: yes const type: IIA occupancy: E 2020 MSBC sprinklered: yes 20% accessibility upgrades: a...
NEW CLASSROOM AND BATHROOM WITHIN AN EXISTING CHURCH. NOT A DAYCARE. CLASSROOMS ARE USED FOR TEACHING STUDENTS DURING THE WORSHIP SERVICE. NEW CLASSROOM WAS PREVIOULSY A LOBBY. NO STRUCTURAL WORK. SEE...
Replace one broken glass window with new window insert and repair drywalls due to water damaged from fire restoration work in bedroom on west elevation wall of existing two family dwellings. aaj (proj...
1st and 2nd floor insulation & drywall replacement work in existing single family house. aaj (project dox plans) - insulate exterior walls on main and 2nd floor using spray foam insulation as required...
(DMH-Pdox) INSTALL BASEMENT EGRESS WINDOW & WELL TO SIDE YARD OF SFD AND FINISH FOR BASEMENT BEDROOM. REQUIRED: EXISTING STAIRWAY TO BASEMENT TO MEET MINIMUM CONTINUOUS 6'-4" HEADROOM, 30" WIDTH,8"MAX...
REPLACE ROTTEN FRONT PORCH LUMBER. INCLUDES NEW COLUMNS, AND NEW HELICAL PIERS. (JJL) ENGINEER: PRIVE ENGINEERING - NATHAN PRIEVE #46203 Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES...
(DMH-Pdox) FIRE DAMAGE REPAIRS TO SFD. NEW BASEMENT BEDROOM WITH NEW EGRESS WINDOW & WELL. - 2020MNSBC SEE ENGINEERS REPAIRS FROM NORMAN DUPREE, #56043. REPLACE 2 BASMENT WOOD COLUMNS. SISTER SELECT J...
(DMH-Pdox) WATER DAMAGE REPAIRS TO SFD. NO NEW FRAMING. INSTALL ATTIC INSULATION, PATCH & REPAIRS, PAINTING AND COSMETIC FINISHES. NOT APPROVAL OF ANY BEDROOMS. APPROVED PLANS AND PERMIT MUST BE ON SI...
PORCH ADDITION. SEE "MILWAUKEE FRAMING CONNECTIONS PAGE" FOR STRUCTURAL DETAILS. INSPECTOR MAY REQUIRE STRUCTURAL ENGINEER TO REVIEW CONSTRUCTION AND SIGN OFF ON STRUCTURAL WORK. (JJL) ENGINEER: AVAIL...
Replace door/storefront -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC
Repair - Install of interior drain tile & sump pump