Renovation Permits in Minneapolis, Minnesota
477 renovation permits filed recently
477 permits
(DMH-Pdox) FRAME & FINISH FOR NEW HALF BATH IN REAR MAIN FLOOR FAMILY ROOM. NO WINDOWS. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHOWER LOCATIONS. WATER-RE...
(DMH-Pdox) BATHROOM REMODEL IN SIDE BY SIDE DUPLEX. REPLACE ROTTED SUB-FLOOR. NO WINDOW REPLACEMENT. REPLACE FIXTURES IN SAME LOCATION. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. INST...
Code compliance - plan20302 2020 msbc
(DMH-Pdox) REFRAME WALL WITH METAL STUDS & FRP WALL FINISHES FOR WARMING KITCHEN. Const type: -- Occupancy: -- 2020 MSBC Tenant: FIRST CHURCH OF OUR LORD JESUS CHRIST Floor(s): MAIN SAC: Net 0 Met Cou...
(DMH-Pdox) BASEMENT 3/4 BATHROOM REMODEL IN SFD. REPLACE FIXTURES IN SAME LOCATIONS. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHOWER LOCATIONS. WATER-RESIS...
Install new casement type egress window with well on north basement floor elevation wall of existing single family house. aaj (project dox plan) also, - finish the interior window trim and update smok...
Basement floor remodel work in existing single family house. aaj (project dox plans) - install two new partition walls with treated bottom plates and door to enclosed new storage room as noted on floo...
Tenant improvement - Bright Minds Childcare CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDULE A CERTIFICATE OF OCCUPANCY INSPE...
Remodel of 32nd floor common corridor, elevator lobby and restrooms certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B 2020 MSBC occupant load: 156 spri...
Demo 3 existing suites including demising walls between suites -ACW certificate of occupancy required: no special inspections required: no const type: IA occupancy: B 2020 MSBC occupant load: 159 spri...
(DMH-Pdox) REMODEL & ENLARGE 2ND FLOOR 3/4 BATHROOM REMODEL IN SFD. NEW PARTITION FRAMING. NO WINDOW REPLACMENT. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. INSTALL FIBER-CEMENT OR GLA...
Main and 2nd floor remodel per tish work order for repairs in existing single family house. aaj (project dox plans) main floor remodel work: - remove existing bathroom door and infill opening to match...
Non-structural remodel of two 2nd floor bathrooms at sfd. tempered glass shall be installed at hazardous locations per r308. install insulation and vapor barrier at exterior wall cavities exposed duri...
Replace 4 porch windows with 2 large size windows in existing single family house. aaj (project dox plans) - replace four 65: x 23" existing porch windows with two 48" x 36" vinyl sliding windows at f...
Bathroom remodel in residential unit -ACW certificate of occupancy required: no special inspections required: no 2020 MSBC windows with sill heights less than 36 inches above the floor shall be equipp...
remodel bathrooms and kitchen. certificate of occupancy required: no const type: 5b occupancy: r2 2020 MSBC sprinklered: yes 20% accessibility upgrades___first floor toilet room._______ Tenant: Floor(...
(DMH-Pdox) REMODEL 2ND FLOOR BATHROOM IN SFD. REPLACE FIXTURES IN SAME LOCATION. NO WINDOW REPLACEMENT. REPLACE FRONT ENTRY DOOR. OTHER COSMETIC UPDATES. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKE...
Interior remodel -ACW certificate of occupancy required: no special inspections required: no occupancy: B 2020 MSBC occupant load: 19 sprinklered: yes Tenant: Lincoln Avenue Communities Floor(s): 1 ar...
(DMH-Pdox) BATHTUB/SHOWER REMODEL TO SHOWER STALL CONVERSION IN TOWNHOME UNIT. -2020 MNSBC NO WINDOW REPLACEMENT. INSTALL INSULATION AND VAPOR BARRIER AT EXTEROR CONDITIONS. INSTALL FIBER-CEMENT OR GL...
Replace less than 100' of ground water collection drain tile no alteration to system or discharge allowed by this permit 2020 msbc