Demolition Permits in Brooklyn, New York
432 demolition permits filed recently
432 permits
Filing for interior demolition including partition walls, flooring, ceiling gyp bd, kitchens and bathrooms
Minor interior renovation to include installing storage racks ,minor structural work for equipment mobility, install curtains, & obtain new Certificate of Occupancy Refer to Pre-Determination # PDA000...
Full demolition of 2 story residential building to comply with OP:32 Immediate Emergency Declaration, DEC# 19743 & 19744
Full demolition of 2 story residential building to comply with OP:32 Immediate Emergency Declaration, DEC# 19743 & 19744
Proposed demolition within existing demised tenancy. No changes to existing demising walls
Full demolition to a one story garage
installation of construction fence to protect site, during full demolition
Full demolition to a one story garage
installation of construction fence to protect site, during full demolition
Application filed to legalize demolition of garage structure
Full demolition to a four story building
Full Demolition of Existing one story Building
Interior renovation existing 2 story building. work in cellar, 1st and 2nd floor. demolition work and construction work as per plan. install and repair partition, flooring, ceiling and painting throug...
Full Demolition of Existing one story Building
Interior renovation existing 2 story building. work in cellar, 1st and 2nd floor. demolition work and construction work as per plan. install and repair partition, flooring, ceiling and painting throug...
Application filed to legalize demolition of garage structure
Proposed alteration to existing warehouse building to repair and raise first (1) floor slab. Demolition and installation of interior non-bearing partitions. This application is being filed to bring bu...
Interior demolition on existing three (3) story with cellar, two (2) family residential building. no exterior work,no change of building bulk, occupancy or egress.
Suspended scaffold installation in accordance with nyc dob rules of chapter 33 safeguards during construction and demolition.
Proposed alteration to existing warehouse building to repair and raise first (1) floor slab. Demolition and installation of interior non-bearing partitions. This application is being filed to bring bu...