Demolition Permits in Brooklyn, New York
432 demolition permits filed recently
432 permits
Interior non-structural demolition and general construction as shown on plans filed herewith at unit 6a. scope of work includes interior partition, millwork installation, lighting replacement, and ref...
interior demolition job only on the 2nd floor and 2 retail stores at 001 as per plans submitted, no change in use, egress or occupancy
Interior non-structural demolition and general construction as shown on plans filed herewith at unit 6a. scope of work includes interior partition, millwork installation, lighting replacement, and ref...
interior demolition job only on the 2nd floor and 2 retail stores at 001 as per plans submitted, no change in use, egress or occupancy
Full demolition to a two story building
Hand-demolition - interior alteration, remove and replace all interior finishes and fixtures including, but not limited to the following: appliances, cabinets, doors, door frames, and hardware. instal...
Full demolition to a two story building
Construction fence for demolition of 3 buildings, 146 Huron Street, 142 Huron Street, and 142Rear Huron Street.
Interior demolition on existing two (2)-family, three (3) story brick residential building with basementand cellar.no change of building bulk, occupancy or egress
Interior demolition on existing two (2)-family, three (3) story brick residential building with basementand cellar.no change of building bulk, occupancy or egress
Demolition of interior partitions, finishes & fixtures + the installation of new partitions, finishes & fixtures. work includes obtaining a new c. of o. for a single-family dwelling. interior renovati...
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Full demolition of existing two story building
Demolition of interior partitions, finishes & fixtures + the installation of new partitions, finishes & fixtures. work includes obtaining a new c. of o. for a single-family dwelling. interior renovati...
Full demolition of existing two story building
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
File to address ECB violation #34841245X & #34881379H. Demolish existing illegal one-story extension at rear yard of existing 3 story mixed use building as per plan. No change in use, egress, or occup...
installation of construction fence to protect site during full demolition
installation of construction fence to protect site, during full demolition.
File to address ECB violation #34841245X & #34881379H. Demolish existing illegal one-story extension at rear yard of existing 3 story mixed use building as per plan. No change in use, egress, or occup...