499 issued permits in Downtown Brooklyn-DUMBO-Boerum Hill, part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
499 permits
Voorhees hall hvac replacement: replacement of hvac system as per the plans filed herewith. no change to use, egress or occupancy.
Sidewalk and vault repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Filing solely to include concrete for the purpose of Concrete TR2 and TR3 inspections relative to concrete heelblocks indicated in SOE per B00939362-S1.
Herewith filing for interior renovation of 1st and 2nd floor as per plans filed herewith. work to be interior partitions and doors. no change in use, occupancy or egress.
Renewal of SR23/1505
Renovation and reconfiguration of existing 2-family dwelling with 2 story + basement extension. Renovation consists of structural and nonstructural, new windows, HVAC, electrical a…
Design foundation and earthwork to facilitate general construction for the renovation and conversion of existing 3 family to 1 family townhouse. work on basement, cellar, 001 - 003…
Application file to exterior facade repair as brick crack repair and brick pointing at front elevation as per plan. remove violation# 39174432r. no change in use, egress or occupan…
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
New mechanical system in conjunction with renovation.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Interior demolition of non structural partitions and related finishes. no change of use, egress or occupancy.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applica…
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application…
Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Alt1 filed to combine 366 and 368 buildings, construct 1st floor addition and change part of the building to event space as per plans filed herewith.
Modifications to plumbing for beauty salon