499 issued permits in Downtown Brooklyn-DUMBO-Boerum Hill, part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
499 permits
Equipment use: single 6000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this app…
Use of monorail for curtain wall panels installation. This application is filed in conjunction with NB B00939362
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Proposed horizontal and vertical enlargement of an existing 4-story building. Convert 3-family to 1-family. Interior renovation at Basement, Cellar, OSP, Roof, 1st thru 3rd floor.…
Addition of sprinkler heads within enclosure related to installation of cooling tower as per plans. no change in use, egress or occupancy.
Filed herewith plumbing work type in conjunction to restaurant fit out. no change in use, occupancy, and egress.
Mechanical worktype filed for Generator filed separately under subsequent filing B01083521-Z1.
Relocate sp heads in cel, 1-3. removal of ex. gas-fired water heaters + assoc. piping. reroute ex. domestic hot + cw piping. no change in use, egress or occupancy.
Minor plumbing modification as per plans. no change in use, egress or occupancy.
Installation of suspended scaffold for facade repair & inspection.
IRA to assist with Condition Assessment.
Interior alteration per plans. No change of use, egress, or occupancy.
File foundation application in conjunction with alt-co nb #: b01096490-i1.
File structural application in conjunction with alt-co nb #: b01096490-i1.
East Spandrel Structural Repairs as per plans filed herewith. No change to use, egress, or occupancy.
Filing herewith modifications to existing building's existing sprinkler system on the 2nd, 3rd, 6th, and 8th floor. Plumbing scope removed. Filing herewith to simply continue this…
Sprinkler work as shown on the plans.
Installation of temporary roof protection as per plans. no change in use, egress or occupancy.
Structural work in conjunction with alt co application as per plans,